BoxHousePH
Portable site offices installed in minutes.
A modular workspace solutions provider and rapid-deployment site infrastructure supplier for the Philippine construction, infrastructure, and industrial sectors.
Where this stands
The brand and product story are complete and ready to use. What gates the marquee accounts is the paperwork — and a few claims worth pressure-testing before they reach an engineer.
Positioning, product spec, pricing, key features, competitive framing, messaging bank, and objection handling are complete and verified. You can sell to small and mid-size general contractors today.
Business registration, TIN, BIR, permits, warranty terms, and contact details are unfilled. Tier-1 contractors (Megawide, DMCI, EEI, MDC, DDT) cannot accredit BoxHouse until these exist.
Founder's notes — read before going to market
The buyers are site engineers and procurement officers who have positioned cranes and commissioned electrical themselves. The unfold is genuinely minutes — but crane placement, leveling, and electrical commissioning realistically run to same-day. "Delivered and operational in minutes" invites a technical buyer to discount the whole pitch. Recommendation: lead with "assembled in minutes, commissioned and handed over the same day." Still a decisive advantage over days-to-weeks of stick-built — and a claim an engineer nods at instead of challenging. This means revising Brand Rule #1.
Units land through the China Import channel (FX-exposed), plus a boom truck and crew per deployment. A peso swing or a far-corner Metro Manila site can erase margin on a fixed ₱130,000. Keep quotation validity short (≤30 days), set a hard floor on volume pricing, and cap the free-delivery radius inside "Metro Manila" beyond which a surcharge applies.
Megawide, DMCI, EEI, MDC, and DDT will not accredit a supplier without SEC/DTI, TIN, mayor's permit, BIR, and warranty terms. Until those exist, BoxHouse can sell to smaller GCs but is locked out of the marquee targets. This is the critical path; everything else is already done.
Open items to launch-ready
- Register the business (SEC or DTI); secure TIN + BIR registration.
- Obtain Mayor's / Business permit (record permit no. + issuing LGU).
- Lock registered address + warehouse / operations address.
- Define and document warranty terms — recommended defaults in §13.
- Confirm commercial terms: payment, lead time, quotation validity — recommended defaults in §12.
- Add contact details — phone, email, website, socials (§19).
- Commission priority photography — hero, interior, 3-stage process, boom-truck lift, warehouse, install team (§17).
- Produce remaining deliverables — quotation template, 1-page flyer, accreditation pack (§18).
A serious supplier, not a startup
Positioning statement. BoxHouse PH is a modular workspace solutions provider and rapid-deployment site infrastructure supplier serving the Philippine construction, infrastructure, and industrial sectors.
- Modular workspace solutions provider
- Rapid-deployment site infrastructure supplier
- Prefab modular structures supplier
- Deployable site office supplier
- Startup
- Container van supplier
- Tiny home brand
- Real estate company
- Housing developer
Brand personality
Professional. Dependable. Operationally credible. Construction-industry native. We sound like a supplier that has done this many times — not a company trying to convince anyone to try something new.
Tone of voice
- Write like a construction equipment supplier, not a tech startup.
- No hype, no buzzwords — no "revolutionary," no "game-changing."
- No exclamation marks in formal documents.
- Use "deploy," "mobilize," "commission" — not "set up" or "build."
- Use "units," not "boxes" or "containers."
- Speak to procurement officers, project managers, and engineers — not consumers.
- Always sound like a company that could be accredited by Megawide, DMCI, EEI, MDC, or DDT Konstract.
What BoxHouse PH does
We supply rapid-deployment modular workspace solutions for construction, industrial, and commercial applications — foldable prefab structures delivered to site and installed within minutes, helping contractors deploy professional facilities faster than traditional construction.
Business model. We sell foldable prefab units as a complete turnkey package — structure, electrical, delivery, and installation in one fixed price. Units are reusable capital assets, not disposable site sheds.
Registration details To fill
Every field below must be completed before submitting to any contractor accreditation process. This is the single biggest blocker to landing Tier-1 accounts.
| Registered business name | BoxHouse PH |
| Business registration (SEC / DTI) | To fill |
| Tax Identification No. (TIN) | To fill |
| Business / Mayor's permit | To fill permit no. + issuing LGU |
| BIR registration | To fill |
| Registered address | To fill |
| Warehouse / operations address | To fill |
| Year established | To fill |
Who we sell to
- Construction companies
- Property & infrastructure developers
- General contractors
- Infrastructure contractors
- Industrial facilities
- Warehousing & logistics operators
- Procurement managers / officers
- Project managers
- Construction managers
- Site engineers / supervisors
- Operations managers
- Facilities managers
- Purchasing / supply-chain heads
Named target accounts — Tier-1 contractors
Megawide Construction · DMCI Holdings / DMCI Homes · EEI Corporation · MDC (Makati Development Corporation) · DDT Konstract · plus other top Philippine developers and general contractors.
These are targets, not clients. Never present them as existing customers unless a signed contract or completed project exists (Brand Rule #4).
BoxHouse Foldable Prefab Unit
A portable, fully equipped foldable modular workspace, delivered to site and operational within minutes.
Foldable prefab unit · complete electrical package (2 LED lights, 1 switch, 2 outlets) · delivery within Metro Manila · full installation, expansion, leveling, and handover.
Self-collection option
Where a construction company collects the unit from our warehouse and carries out its own installation, the all-in price may be adjusted by negotiation. The negotiated price reflects the delivery and installation scope not provided by BoxHouse PH; responsibility for transport, lifting, placement, leveling, and electrical commissioning passes to the client.
- A level, accessible placement area suitable for the unit footprint
- Site access for delivery and lifting equipment
- An electrical supply connection point for final commissioning
- Any permits or site clearances required by the project or LGU
- Delivery beyond Metro Manila
- Multi-unit and multi-site deployments
- Stacked or multi-unit configurations
- Relocation of previously supplied units
Build & engineering
| Item | Specification |
|---|---|
| Length | 5.8 m |
| Width | 2.5 m |
| Height | 2.5 m |
| Floor area | 14.5 sqm |
| Wall panel | 50 mm EPS purification wall panel |
| Wall cladding | 0.376 PPGI steel cladding |
| Roof system | Built-in drainage, 360° full coverage, glue-free physical waterproof system |
| Door | Steel door, 840 mm × 2035 mm |
| Floor substrate | 18 mm high-strength cement fiberboard |
| Floor finish | 2 mm PVC flooring |
| Windows | 2 × PVC sliding windows, single glazing |
| Lighting | 2 × LED lights |
| Switching | 1 × switch |
| Power outlets | 2 × electrical outlets |
| Frame | Sturdy steel frame construction |
| Stacking | Stackable up to two levels |
| Mobility | Crane-lift ready |
| Weather resistance | Engineered for strong winds, earthquakes, and heavy rain |
| Storage | Collapses flat for compact storage and transport |
| Setup time | Unfolded, assembled, and operational in minutes |
| Customization | Adaptable for commercial, residential, or emergency use |
Copy-ready, every claim verified
Use these as-is in ads, decks, social posts, or sales materials.
- Installed in minutes — not days, not weeks
- Unfolded, assembled, and operational in minutes
- Three-stage deployment: folded transport → expansion on site → operational office
- Sturdy steel frame for long-lasting performance
- 50 mm EPS insulated wall panels for thermal comfort
- Sealed waterproof roof with built-in drainage and 360° coverage
- Glue-free physical waterproofing — holds through repeated folding
- Engineered for strong winds, earthquakes, and heavy rain
- Foldable — collapses flat for efficient storage and transport
- Relocatable — crane-lift ready for repeated redeployment
- Reusable across projects (capital asset, not disposable expense)
- Stackable up to two levels for efficient site footprint
- Fixed all-in price of ₱130,000 (no hidden costs within MM)
- Structure, electrical, delivery, and installation included
- No labor, materials, or coordination required from the client
- Customizable for residential, commercial, or emergency use
- Suits site offices, guard posts, control rooms, welfare facilities
Short-form list for one-pagers
Folded transport to operational office
Folded transport
The unit ships in a compact folded configuration — reducing transport footprint, simplifying access to constrained sites, and enabling efficient delivery by boom truck.
Expansion on site
On arrival, the unit is positioned and expanded into full structural form. Walls, roof, and floor are deployed and secured, then leveled and prepared for commissioning.
Operational office
The electrical package is commissioned, fittings verified, and the unit handed over as a finished, fully functional office ready for immediate occupancy.
Deployment is scheduled with the client's site team to align with access windows, ground conditions, and mobilization sequencing. Site requirements are confirmed in advance so deployment proceeds without delay.
Where units go to work
| Application | Description |
|---|---|
| Construction site offices | Professional workspace for project managers, engineers, and site teams |
| Engineering & supervision | Technical workspace positioned close to active works |
| Documentation / control rooms | Secure space for drawings, records, and monitoring equipment |
| Guardhouses & security posts | Durable, weatherproof posts for site security and access control |
| Industrial & warehouse support | Operational offices and dispatch points within industrial environments |
| Welfare facilities | Enclosed, insulated space for site welfare |
| Multi-site deployment | Relocatable asset redeployed across successive projects |
| Emergency & disaster response | Rapidly deployed shelters, command posts, or temporary facilities |
| Custom configurations | Adapted for residential, commercial, or specialized requirements |
Traditional site office vs BoxHouse PH
| Consideration | Traditional construction | BoxHouse PH |
|---|---|---|
| Deployment time | Days to weeks | Minutes |
| Cost certainty | Variable | Fixed all-in ₱130,000 |
| Labor requirement | Diverts site labor | Installed by BoxHouse teams |
| Quality consistency | Varies by site and crew | Standardized specification |
| Reusability | Demolished at closeout | Relocatable and reusable |
| Residual value | Sunk project cost | Retained capital asset |
| Relocation | Not practical | Crane-lift ready |
| Weatherproofing | Depends on build quality | Engineered insulated system |
| Wind / seismic resistance | Depends on build quality | Engineered for wind & quakes |
| Footprint efficiency | Single level | Stackable to two levels |
Traditional construction treats the site office as a disposable, project-specific expense. BoxHouse PH treats it as a deployable, reusable capital asset — faster mobilization, predictable cost, consistent quality, and retained value across a contractor's entire project portfolio.
Warehouse to handover, in-house
- Warehouse facilities — unit storage, staging, and ready inventory for rapid dispatch
- Delivery equipment & boom trucks — transport and on-site positioning, including constrained access
- Crane-lift placement — units placed into confined, elevated, or congested positions
- Dedicated installation teams — on-site expansion, leveling, and electrical commissioning
- Contractor-led operations — personnel with direct construction-industry experience
- Site deployment personnel — trained handover team confirming positioning and functionality
We control the full chain from warehouse to operational handover. That's what lets us commit to timelines and support clients running multiple concurrent sites.
Pricing & deal mechanics
Recommended values below are my proposed defaults — sensible for PH capital-equipment supply. Confirm each before quoting a contractor. Confirmed values are already set.
| Term | Detail |
|---|---|
| Standard unit price | Confirmed ₱130,000 all-in (within Metro Manila) |
| Volume pricing | Confirmed Available for multi-unit orders, by quotation — set a hard floor |
| Payment terms | Recommended 50% deposit on signed PO, 50% on delivery prior to offloading |
| Standard lead time | Recommended 5–7 working days from confirmed PO for in-stock units (subject to China Import inventory) |
| Quotation validity | Recommended 30 days (shorter if FX is volatile) |
| Order confirmation | Confirmed Signed purchase order or quotation acceptance |
| Self-collection pricing | Confirmed Negotiable when the client handles pickup and installation |
| Free-delivery radius | Recommended Define a cap within Metro Manila; surcharge beyond it |
Coverage & support
Recommended terms below are proposed defaults. Warranty must be finalized before submission to any contractor.
| Item | Detail |
|---|---|
| Warranty type | Confirmed Against manufacturing defects in materials and workmanship |
| Coverage period | Recommended 12 months from delivery |
| Covered components | Recommended Structural steel frame, wall panels, roof waterproofing, electrical as installed |
| Exclusions | Confirmed Damage from misuse, unauthorized modification, accident, or relocation by third parties |
| Spare parts | Confirmed Available by quotation |
| Relocation services | Confirmed Available by quotation for previously supplied units |
| Inspection / servicing | Confirmed Available on request |
| Support response time | Recommended Within 48 hours |
Answers, ready to deploy
Open all FAQs
Pre-approved copy blocks
Use as-is or adapt. Every claim is verified and truthful.
Elevator pitch · 10 seconds
BoxHouse PH supplies foldable prefab site offices that are delivered and operational in minutes — ₱130,000 all-in, reusable across projects.
Short description · 30 seconds
BoxHouse PH is a modular workspace solutions provider for the construction and industrial sectors. We supply foldable prefab units that arrive folded, expand and assemble in minutes, and hand over as fully equipped offices with electrical, insulation, and waterproofing included. At ₱130,000 all-in, our units replace traditional site-office construction with a faster, cheaper, reusable alternative.
For procurement documents
BoxHouse PH is a rapid-deployment site infrastructure supplier serving construction companies, developers, and general contractors across Metro Manila and surrounding regions. Our core product is the BoxHouse Foldable Prefab Unit — a portable, fully equipped modular workspace supplied as a turnkey package at a fixed all-in price of ₱130,000. Units are delivered, installed, and operational within minutes, and are relocatable and reusable across multiple projects. We maintain warehouse facilities, delivery equipment, boom trucks, and dedicated installation teams to support deployment reliability at scale.
For social media · casual
Site office ready in minutes. Not days. Not weeks. Minutes. Foldable prefab. Delivered. Installed. Done. ₱130,000 all-in.
Value proposition · for decks & proposals
Traditional site-office construction diverts labor, consumes schedule, and produces a structure that's demolished at closeout. BoxHouse PH offers a structurally different approach: a foldable prefab unit that arrives on site, is assembled in minutes, and serves as a reusable capital asset across your entire project portfolio — at a fixed price with no surprises.
For sales conversations & proposals
Open the objection playbook
| Objection | Response |
|---|---|
| "It's just a container van" | It is not a container van. It is a purpose-built foldable prefab structure — insulated wall panels, sealed waterproof roof, integrated electrical, PVC flooring, steel frame — engineered for repeated deployment. |
| "We can build a site office cheaper" | Factor in labor diverted from your primary scope, days of schedule consumed, inconsistent quality, and a structure demolished at closeout. Our unit is ₱130,000 all-in, reusable across projects, and operational in minutes. |
| "Will it survive a typhoon?" | Engineered to withstand strong winds, seismic activity, and heavy rain. The waterproofing uses physical sealing (not adhesives), so it holds integrity through repeated folding and transport. |
| "We need it outside Metro Manila" | We deliver beyond MM by separate quotation. Provide the site address and we will quote delivery. |
| "We want to pick it up ourselves" | That is an option. Where you collect from our warehouse and handle installation, the price is negotiable. |
| "Can we try one first?" | Absolutely. Order a single unit for your next project. Once you see the deployment speed and quality, scale to multi-unit orders with volume pricing. |
| "Is your company accredited?" | We are prepared to complete your supplier registration and accreditation process — business registration, tax documents, product specs, warranty terms, and all supporting documentation your procurement team requires. |
What to shoot
Needed for the company profile, website, social, and sales materials. Organize in a shared drive or media library.
- Hero — deployed unit on an active site (exterior, wide)
- Interior — set up as a working office (desk, people)
- Three-stage: folded → expanding → operational
- Boom truck lifting / positioning a unit
- Warehouse with multiple units in inventory
- Installation team at work (safety gear)
- Side-by-side: conventional shed vs BoxHouse
- Detail close-ups: panel edge, roof junction, floor, frame
- Unit being relocated (on truck / lifted off)
- Multiple units deployed on one large site
- Use cases: guardhouse, control room, welfare
- Management / team portrait
- Drone / aerial of a unit on site
- Time-lapse / video of unfolding & assembly
- Unit in harsh weather (rain — waterproofing)
- Before/after of a site with and without the unit
- Stacked two-level configuration
Production status
| Document | Status | Notes |
|---|---|---|
| Company & Capability Profile (20-pg Word) | Complete | Image placeholders need photos inserted |
| Notion Handoff / Brand Bible | Complete | Fill all To-fill fields |
| Formal Quotation Template | Not started | — |
| One-Page Sales Sheet / Flyer | Not started | — |
| Supplier Accreditation Pack | Not started | Bundle: registration, permits, specs, warranty |
| Social Media Content Calendar | Not started | — |
| Website Copy | Not started | — |
| Email Templates (cold outreach) | Not started | — |
| Presentation Deck (pitch) | Not started | — |
Reach BoxHouse PH To fill
| Phone | To fill |
| To fill | |
| Website | To fill |
| To fill | |
| To fill | |
| Registered address | To fill |
| Warehouse address | To fill |
| Service area | Metro Manila and surrounding regions (beyond MM by quotation) |